Kategorie:Greater Toronto Area

Aus Freeway Wiki
Zur Navigation springen Zur Suche springen
Gleise beim Bahnhof Union

Produktbeschreibung des Herstellers

The Greater Toronto Area (GTAV1.5) is the largest project MLT has built to date. It started out as the GO Transit Project for Bombardier/TCS. The GO Project was used to aid in training new GO Transit operators in the winter of 2006/07. The main focus was accurate trackwork and signaling as well as the necessary signage and interactive objects for the operators to negotiate the route. The Toronto Metro is the largest and most highly populated urban area in Canada and the GO Transit System is one of the largest commuter rail services in the world.

MLT's GTA 1.5 was built with additional detail and trackwork. With over 230 miles of main track on 8 subdivisions, 43 passenger stations, dozens of yards and hundreds of industrial spurs, this route will keep even the most ambitious developer and operator busy. The GTA is a great companion to the very popular Niagara Corridor and ties in nicely to the recently released Bala Sub.

Ergänzungen

Auf der MLT-Homepage gibt es ein Update auf V1.5 (etwas versteckt unter "Product Information", nicht unter "Patches and Updates").
Es kommt leider nur eine sehr kurze Aufgabe ("Tram") zu den 20 vorhandenen hinzu - leider ohne Abschlusspunkt und Zeitvorgabe.
Das Update ist kostenlos für V1.1-Besitzer. Mir liegt aber nur V1.01 vor, damit ging es auch. Es führt aber zu optischen Unstimmigkeiten (Oberleitungen laufen quer über die Straße ohne Fahrbahn).

Hwagner 12. Apr. 2011